Çanta Wind Farm
Turkey
Çanta Wind Farm is a 2014 wind power plant consisting of 19 wind turbines with a total installed capacity of 47.5 MW. The wind farm is in Çanta in the Silivri district of Istanbul Province, northwestern Turkey. The wind farm was initially projected by Bora Wind Energy Company in 2011. After Boydak Energy Company took over Bora Co., construction began in 2012. The farm went into production in May 2014 with six turbines, each with a capacity to generate 2.5 MW. By the end of June 2014, eight more turbines were in service, increasing the total installed capacity to 35 MW.