Akkuyu Nuclear Power Plant
Gülnar, Turkey
The 63rd largest power station in the world
The Akkuyu Nuclear Power Plant (Turkish: Akkuyu Nükleer Güç Santrali) is a large nuclear power plant in Turkey under construction in Akkuyu, Büyükeceli, Mersin Province. It is expected to generate around 10% of the country's electricity when completed. The official launch ceremony took place in April 2015, and the first reactor is expected to come online in 2026 after a three year delay. In May 2010, Russia and Turkey signed an agreement that a subsidiary of Rosatom would build, own, and operate a power plant in Akkuyu comprising four 1,200 MWe VVER1200 units. Construction of the first reactor commenced in April 2018. In February 2013, Russian nuclear construction company Atomstroyexport (ASE) and Turkish construction company Özdoğu signed the site preparation contract for the proposed Akkuyu Nuclear Power Plant. The contract includes excavation work at the site. It is expected to be the first build–own–operate nuclear power plant in the world.
In May 2010, Russia and Turkey signed an agreement that a subsidiary of Rosatom — Akkuyu NGS Elektrik Uretim Corp. (APC: Akkuyu Project Company) — would build, own, and operate a power plant at Akkuyu comprising four 1,200 MW VVER units. The agreement was ratified by the Turkish Parliament in July 2010. Engineering and survey work started at the site in 2011.
In 2013, Russian nuclear construction company Atomstroyexport (ASE) and Turkish construction company Ozdogu signed the site preparation contract for the proposed Akkuyu nuclear power plant. The contract includes excavation work at the site.
The official launch ceremony took place in April 2015. On 9 December 2015, the news agency Reuters reported that Rosatom stopped construction work at the power plant and that Turkey was assessing other potential candidates for the project. But Rosatom and the Turkish Energy and Natural Resource Ministry promptly refuted the statement. Despite tensions mounted between Russia and Turkey, due to the Turkish downing of a Russian fighter jet on 24 November (2015), Russian President Vladimir Putin stated that the decision to continue is purely a commercial one. A source told RIA Novosti that the company set up to construct the nucle
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).