Presa y central eléctrica El Salto
El Carpio, Spain
El Salto Dam (Presa El Salto), located on the Guadalquivir River in the municipal district of El Carpio (Province of Córdoba, Spain), comprises a dam and its corresponding hydroelectric power station. Built for storage of water for electricity generation and irrigation, the dam is situated near the 3.3 km mark on the Pedro Abad-Adamuz highway (CO-412). Its Neo-Mudéjar design is the result of a collaboration between architect Casto Fernández Shaw and engineers Carlos Mendoza and Antonio del Águila. The Madrid-based engineering consulting firm Mengemor undertook construction of the dam between 1918 and 1922. Since its inception, the dam has proved valuable to the local population for its contribution to the development and economic expansion of the area.
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).