Colombo South Waste Processing Facility
Colombo District, Sri Lanka
The 3371st largest power station in the world
The Colombo South Waste Processing Facility (also referred to as the Karadiyana W2E Project or Karadiyana Power Station) is a municipal solid waste-fired thermal power station currently under construction at a 10-acre (40, 000 m2) site in Karadiyana, Sri Lanka. Together with the KCHT Power Station, it is one of two projects that won the bid by the Urban Development Authority, from a pool of 121 bidders. Construction of the facility began on 23 August 2017 with a completion slated for mid-2019. The estimated cost of the project is approximately US$91 million. The 10 megawatt power station will be operated by Fairway Waste Management (Private) Limited, a subsidiary of the Fairway Holdings. It will use 500 metric tons (1, 100, 000 lb) of waste, with the generated power sold to the state-owned Ceylon Electricity Board at a rate of Rs. 37.10 per KWh generated. The residual bottom ash from the process will be used for road construction and other uses, while the unusable fly ash (amounting to 2%) will be disposed of at predesignated locations.
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).