Bushehr Nuclear Power Plant
Howmeh Rural District, Iran
The 974th largest power station in the world
The Bushehr Nuclear Power Plant is a nuclear power plant in Iran, located 17 kilometres (11 mi) southeast of the city of Bushehr, 1,200 kilometres (750 mi) south of Tehran, between the fishing villages of Halileh and Bandargeh along the Persian Gulf. Construction of the plant was started in 1975 by German companies, but the work was stopped in 1979 after the Islamic revolution of Iran. The site was repeatedly bombed during the Iran–Iraq war (1980-1988). Later, a contract for finishing the plant was signed between Iran and the Russian Ministry for Atomic Energy in 1995, with Russia's Atomstroyexport named as the main contractor. The work was delayed several years by technical and financial challenges as well as by political pressure from the West. After construction was again in danger of being stopped in 2007, a renewed agreement was reached in which the Iranians promised to compensate for rising costs and inflation after completion of the plant. Delivery of nuclear fuel started in 2007. The plant started adding electricity to the national grid in September 2011, and opened in September 2011, attended by Russian Energy Minister Sergei Shmatko and head of the Rosatom Sergey Kiriyenko. The project is considered unique in terms of its technology, the political environment and the challenging physical climate. It is the first civilian nuclear power pla
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).