Saturday, August 22, 2026 Search My Trip EnglishChinese
World news · travel · culture
Taiwan The Taiwan Times
Taiwan's window to the world

Karangkates II Tunnel

Karangkates II railway tunnel is a railway tunnel that build in 1965 and finished in 1970 with a Karangkates railway tunnel by the Government of Indonesia at the same time the construction of the Karangkates Dam. This tunnel is 440 meters long and is managed by Operations Region VIII Surabaya part of Malang Regency. The railway tunnel has the number wisdom building 352. If a person go east, this railway tunnel is located after Karangkates I railway tunnel.

Tunnel data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).

Other tunnels in Indonesia