Highfield station
Canada
The Green Line, also known as Route 203, is an expansion of the light rail (LRT) network in Calgary, Alberta, planned to run between Calgary's north-central and southeastern boundaries, connecting with the Red Line and the Blue Line in the city's downtown. The Green Line is the largest public infrastructure project in Calgary's history and the first rail line in Calgary to operate low-floor trains. If completed, the full vision of the Green Line would comprise 29 stations spanning 46 kilometres (29 mi), bringing the total number of CTrain stations in Calgary from 53 to 82. Like the Red Line and Blue Line, the Green Line will be constructed in phases. The first phase to be built stretches from 16 Avenue N in the downtown to Shepard Station in the SE and will include two segments: the SE Segment and the Downtown Segment. The first segment to be constructed is the SE Segment, with 10 stations and 16 km of track from Event Centre/Grand Central Station to Shepard. The project is funded with three roughly equal contributions from the City of Calgary, the Government of Alberta, and the Government of Canada. The Green Line groundbreaking event took place on June 26, 2025, marking the official start of construction for Phase 1 of the project. The ceremony was held at the site of the future Shepard LRT station and Green Line's Maintenance and Storage Facility. Officials from the three fu
Data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).