Tagore MRT station
Singapore
The Thomson–East Coast Line (TEL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore. Coloured brown on the rail map, it is the sixth line of the MRT network and is fully underground. When fully completed, it will be around 57 kilometres (35 mi) in length and serve 32 stations, becoming one of the world's longest driverless rapid transit lines. It runs along a combined north–south and east–west corridor, starting in the north at Woodlands town, passing through Upper Thomson and the towns of Ang Mo Kio and Bishan, heading south to the city centre at Orchard Road and Marina Bay, and subsequently heading eastwards along the eastern coast of the country through Kallang, Marine Parade, southern Bedok and Upper East Coast, before passing through Changi Airport and ending at Tanah Merah. The line was first announced by the Land Transport Authority (LTA) on 15 August 2014, merging the previously planned and distinct Thomson (TSL) and Eastern Region (ERL) lines. By then, construction of the TSL had already begun in January 2014. The line is being opened in stages, beginning with Stage 1 on 31 January 2020. Stage 2 opened on 28 August 2021 and Stage 3 opened on 13 November 2022. Stage 4 opened on 23 June 2024 while Stage 5 is scheduled to open from the second half of 2026. Meanwhile, Mount Pleasant and Marina South stations, which were structurally completed as part of Stage
TrainStation data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).