Sunday, August 30, 2026 Search My Trip EnglishChinese
World news · travel · culture
Taiwan The Taiwan Times
Taiwan's window to the world

Khlong Nueng station

Thailand

The SRT Dark Red Line (also referred to as Thani Ratthaya Line) is part of the SRT Red Line suburban railway system to serve the greater Bangkok Metropolitan Region running for 26 km (16 mi) between Krung Thep Aphiwat Central Terminal and Rangsit. Phase I of the line opened for trial operations on 2 August 2021, with full commercial services beginning on 29 November 2021. Tenders for the much delayed 8.84 km (5.49 mi) Phase II extension of the line from Rangsit to Thammasat University were opened in December 2025. Submissions to the SRT were due by 29 December 2025, with bid winners announced in January 2026 and contracts signed in May 2026. Construction is expected to start in July 2026 and take 36 months with a target to start operation in 2029.

TrainStation data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).

Other train-stations in Thailand