Bang Pakaeo MRT station
Thailand
The MRT Purple Line or The M.R.T. Chalong Ratchadham Line is Bangkok's fifth rapid transit line, following the Sukhumvit Line, Silom Line, Blue Line, and Airport Rail Link. The line is 23 km (14 mi) long, serving the north-western area of Bangkok running from Tao Poon to Khlong Bang Phai in Nonthaburi Province. The Northern section of the line opened on 6 August 2016, with travel between Khlong Bang Phai and Tao Poon. It is the second line of MRT system and is operated by BEM under a concession contract. Daily ridership is 70,000. A 23.63 km (14.68 mi), 17 station Southern extension of the line between Tao Poon and Kru Nai consisting of a 14.3 km (8.89 mi) underground section and a 9.3 km (5.78 mi) elevated section commenced construction in August 2022. As of April 2025, construction has progressed to 53.4% completion with an expected opening date of 2028. However, a road collapse in September 2025 caused the opening date to be delayed.
TrainStation data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).