Yacyretá Dam
Paraguay
The 175th largest power station in the world
The Yacyretá Dam or Jasyretâ-Apipé Hydroelectric Power Station (from Guaraní jasy retã, "land of the moon") is a dam and hydroelectric power plant built over the waterfalls of Jasyretâ-Apipé in the Paraná River, between the Paraguayan City of Ayolas and the Argentine Province of Corrientes. The dam is named for Yacyretá Island just upstream, much of which the dam submerged. The word "Yacyreta" is the Hispanicized spelling of the original Guaraní term Jasyretâ. The dam is 808 metres (2, 651 ft) long, and its installed equipment has a maximum power output of 3,100 megawatts (4, 200, 000 hp), with a record maximum annual power output of 20.091 TWh (72.33 PJ) achieved in year 2012, and a maximum water flow rate of 55,000 cubic meters per second. Until February 2011, its reservoir was seven meters below its planned water level, only allowing it to operate at 60% capacity. The project generated controversy and criticism during its planning and construction because of the effects it had on local ecology, particularly the flooding of a unique environment causing the extinction in the wild of several species. The financial management of the project also garnered criticism, as it greatly exceeded its original budget, ultimately costing more than $11 billion. On 18 September 2006 Paraguay agreed to settling its part of the overall debt of $11,000,000,000 owed to Argentina for the constructi
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).