Sărdănești Power Station
Gorj County, Romania
The Sărdăneşti Power Station will be one of the largest electricity producers in Romania, having 4 groups of 175 MW each totalling an installed capacity of 700 MW and an electricity generation capacity of around 5.3 TW/year. The power plant will be situated in Gorj County (South-Western Romania) on the banks of the Jiu River in Sărdăneşti. The construction of the power plant will begin in 2009 and it will be finished in 2013 at a total cost of US$ 1.3 billion.
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).