Rostov Nuclear Power Plant
Rostov Oblast, Russia
The 100th largest power station in the world
The Rostov Nuclear Power Plant, also known as the Volgodonsk Nuclear Power Plant, is a Russian nuclear power plant located on the left bank of Tsimlyansk Reservoir in the lower stream of the Don river near Volgodonsk, Rostov Oblast. Construction of Rostov reactor No. 1 began in 1977 and operations began in 2001. Construction of reactor No. 2 commenced in 1983 and finished in 2010. Unit 3 was connected to the electrical grid for the first time in December 2015. Unit 4 underwent first criticality on 7 December 2017, and put into commercial operation on 28 September 2018. Units 3 and 4 are of an upgraded VVER-1000/320 subtype. The post–Soviet Union revival of the nuclear industry of Russia took place at Rostov in the early 2000s, with the completion of the building of unit 2 in 2010, unit 3 in 2015 and unit 4 in 2017. Unit 4 was the last VVER-1000/V-320 reactor built.