Nimoo Bazgo Hydroelectric Plant
India
The 3000th largest power station in the world
The Nimoo Bazgo Power Project is a run-of-the-river power project on the Indus River situated at Alchi village, 75 kilometres (47 mi) from Leh in the Indian Union Territory of Ladakh. The project was conceived on 1 July 2001 and approved on 8 June 2005, and construction began on 23rd Sept, 2006. The project involved construction of a 57-high m (187 ft) concrete dam with five spillway blocks of 13 m (43 ft) each having ogee profile. The dam is 247.9m in length. It was officially completed and open in August 2014. The Nimoo Bazgo power plant was stated to utilise a rated net head of 34 m (112 ft) to generate 239.30 gigawatt-hours (861.5 terajoules) in a 90% dependable year. The project has three surface power units of 15 MW (20, 000 hp) each with a total installed capacity of 45 megawatts (60, 000 hp). Every unit has a 3.3 m (11 ft) diameter, each 63 m-long (207 ft) penstocks. Each operating unit is stated to have been designed for a discharge of 48.7 m3/s (1, 720 cu ft/s) and also have transformer yard and switch yard. The project was connected to the northern grid through a 220 kV transmission line from Leh to Srinagar. The dam diverts water from the Indus river by a 372 m (1, 220 ft) long diversion channel and involves a flooding of only 3.42 km2 (1.32 sq mi). Thus the power density is 13.16 megawatts per square kilometre (13.16 W/m2, 34.1 MW/sq mi). The project was developed by N
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).