Nabinagar Super Thermal Power Project
Bihar, India
The 651st largest power station in the world
Nabinagar Super Thermal Power Project is a coal-based thermal power plant located at Sivanpur village in Ankorha in Nabinagar taluk in Aurangabad district, Bihar. It was conceptualised in 1989 by the then Chief Minister of Bihar Satyendra Narayan Sinha who sent the proposal to set up a NTPC's super thermal power project at Nabinagar in Bihar's Aurangabad district to then Prime Minister of India Rajiv Gandhi; but the project went into limbo as the following state governments failed to follow it. In 2007, Manmohan Singh's government finally put a stamp of approval on it. The power plant is owned by the Nabinagar Power Generating Company- initially a 50:50 joint venture between NTPC Limited and Bihar State Power Holding Company Limited. The Nabinagar plant will have capacity of 4380 MW (660 MW × 6). The project's generation capacity initially was to be 3960 MW but in 2016, the production capacity was increased to 4380 MW. Nabinagar Super Thermal Power Project will be third largest power project in India, after 4700 MW Vindhyachal Thermal Power Station (Singrauli) and maharashtra belar. This Super Thermal Power Project is spread over 2970 acres, which includes 150 acres of land for the township and 63 acres of land for construction of rail corridor. On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Nabinagar Power Gener
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).