Loharinag Pala Hydro Power Project
India
The 1289th largest power station in the world
Loharinag Pala Hydropower Project is a run-of-the-river hydroelectricity generating project planned by the National Thermal Power Corporation (NTPC) Ltd to have an output capacity of 600 MW (150 MW x 4 Units). The project is located on the river Bhagirathi, the headstream of the Ganges River at Loharinag Pala, below the confluence of the Songad River, next to NH 34 in Uttarkashi District of Uttarakhand state, India. This is about 100 kilometres (62 mi) upstream of the Tehri Dam. The main project construction contracts were awarded and construction started in 2006, however, work was stopped in 2009 after Professor G. D. Agrawal, one of India's eminent scientists, came close to dying on the 38th day of his fast in protest of the blocking the headwaters of the sacred River Ganges. Tarun Bharat Sangh, headed by Magsaysay award-winner, Rajendra Singh also played a pivotal role in stopping the project. The project was officially scrapped in 2010. The Loharinag-Pala project was one of several hundred dams and barrages planned or now being constructed by India, in the southern foothills of the Himalayas. Together they are expected to provide 150,000 MW of electricity for areas in which power cuts are frequent and demand is growing fast.
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).