Wednesday, August 12, 2026 Search My Trip EnglishChinese
World news · travel · culture
Taiwan The Taiwan Times
Taiwan's window to the world

Klaipėda Geothermal Demonstration Plant

Klaipėda, Lithuania

The Klaipėda Geothermal Demonstration Plant is a geothermal heating plant in Klaipėda, Lithuania, constructed during the late 1990s and early 2000s. It was the first geothermal heating plant in the Baltic Sea region. Its purpose was to reduce carbon dioxide, sulfur dioxide, nitrogen oxide, and particulate emissions in the area, as well as to reduce Lithuania's dependence on foreign energy sources. The plant supplies district heating to the city. Construction was financed by a loan from the World Bank (US$5.9 million) and a grant from the Global Environment Facility (US$6.9 million). The Danish state company Dansk Olie og Naturgas (now Ørsted) provided technical support, and Enterprise Geoterma served as the implementing agency. The total cost of the plant was US$19.5 million. Since 2017 it has been closed due to financial and technical issues and the operating company Geoterma filled for bankruptcy and was liquidated in 2019.

Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).

More power stations in Lithuania

  1. Ignalina Nuclear Power Plant2.6 GW
  2. Elektrėnai Power Plant1.05 GW
  3. Kruonis Pumped Storage Plant900 MW
  4. Vilnius Combined Heat and Power Plant360 MW
  5. Mažeikiai Power Plant160 MW

Other large power stations worldwide

  1. Bui Dam · Ghana1,440 GW
  2. Western Green Energy Hub · Australia50 GW
  3. Gujarat Hybrid Renewable Energy Park · India30 GW
  4. Three Gorges Dam · China22.5 GW
  5. Baihetan Dam · China16 GW
  6. Itaipu Dam · Paraguay14 GW
  7. Xiluodu Dam · China13.86 GW
  8. Belo Monte Dam · Brazil11 GW