Isimba Power Station
Uganda
The 2134th largest power station in the world
Isimba Hydroelectric Power Station is a 183.2 megawatts (245, 700 hp) hydroelectric power station commissioned on 21 March 2019 in Uganda. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).