Indian Point Energy Center
New York, United States
The 896th largest power station in the world
Indian Point Energy Center (IPEC) is a defunct three-unit nuclear power station located in Buchanan, just south of Peekskill, in Westchester County, New York. It sits on the east bank of the Hudson River, about 36 miles (58 km) north of Midtown Manhattan. The facility permanently ceased power operations on April 30, 2021. Before its closure, the station's two operating reactors generated about 2,000 megawatts (MWe) of electrical power, about 25% of New York City's usage. The station is owned by Holtec International, and consists of three permanently deactivated reactors, Indian Point Units 1, 2, and 3. Units 2 and 3 were Westinghouse pressurized water reactors. Entergy purchased Unit 3 from the New York Power Authority in 2000 and Units 1 and 2 from Consolidated Edison in 2001. The original 40-year operating licenses for Units 2 and 3 expired in September 2013 and December 2015, respectively. Entergy had applied for license extensions and the Nuclear Regulatory Commission (NRC) was moving toward granting a twenty-year extension for each reactor. However, due to a number of factors including sustained low wholesale energy prices that reduced revenues, as well as pressure from local anti-nuclear groups and then-Governor of New York Andrew Cuomo, it was announced that the plant would shut down by 2021. The plant permanently stopped generating energy on April 30, 2021. About 1,000
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).