Huites Dam
Choix Municipality, Mexico
The 1543rd largest power station in the world
Huites Dam, officially known as Luis Donaldo Colosio Dam, is located on the Rio Fuerte in northwestern Sinaloa, Mexico 130 kilometres (81 mi) northeast of Los Mochis. The 162-metre (531 ft)-high, hybrid concrete arch-gravity dam impounds a reservoir called Lago Huites or Presa Luís Donaldo Colosio and is owned by the Comisión Federal de Electricidad. The construction of a dam on the upper Rio Fuerte was considered since the 1940s but the first detailed studies were not made until 1974–1977. Construction started in 1992 with the excavation of a diversion channel around the dam site and the implementation of a pair of cofferdams to protect the site from floods. About 485,000 cubic metres (634, 000 yd3) of material was excavated from the site before construction on the actual dam could begin. Placement of the 2,980,000 cubic metres (3, 900, 000 yd3) of concrete in the dam, hydroelectric power plant and spillway structures was completed in 29 months, with the workforce peaking at 2,671 in May 1993. Construction was completed in 1995 at a cost of roughly US$ 212 million. The dam's two generators were commissioned on 15 September 1996. The impounded water behind the dam forms a reservoir with a capacity of 4.568 cubic kilometres (3, 703, 000 acre⋅ft), of which 2.908 cubic kilometres (2, 358, 000 acre⋅ft) is active capacity and 2.408 cubic kilometres (1, 952, 000 acre⋅ft) is reserved for irrig
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).