Saturday, August 22, 2026 Search My Trip EnglishChinese
World news · travel · culture
Taiwan The Taiwan Times
Taiwan's window to the world

Gribo–Popoli Hydroelectric Power Station

Ivory Coast

The Gribo–Popoli Power Station, also Gribo Popoli Power Station, is a hydroelectric power station under construction across the Sassandra River, in Ivory Coast. This renewable energy power station is owned and is under development by the Government of Ivory Coast, through its wholly owned subsidiary, CI-Energies, the national electricity utility parastatal company. With partial funding from the Exim Bank of China, the engineering, procurement and construction (EPC) contract was awarded to Sinohydro, the Chinese hydropower engineering and construction company. CI-Energies is the expected off-taker of the energy generated here. Construction is reported to have started in 2021, with commissioning anticipated in 2024.

Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).

More power stations in Ivory Coast

  1. Soubré Hydroelectric Power Plant275 MW
  2. Taabo Dam210 MW
  3. Kossou Dam174 MW
  4. Buyo Dam165 MW
  5. Atinkou Thermal Power Station

Other large power stations worldwide

  1. Bui Dam · Ghana1,440 GW
  2. Western Green Energy Hub · Australia50 GW
  3. Gujarat Hybrid Renewable Energy Park · India30 GW
  4. Three Gorges Dam · China22.5 GW
  5. Baihetan Dam · China16 GW
  6. Itaipu Dam · Paraguay14 GW
  7. Xiluodu Dam · China13.86 GW
  8. Belo Monte Dam · Brazil11 GW