Goyder South Wind Farm
South Australia, Australia
The 1565th largest power station in the world
Goyder South Wind Farm is the first part of Neoen's Goyder Renewables Zone development near Burra, South Australia. The Goyder South Wind Farm will be on the hills south-east of the town of Burra. Early construction works for Stage 1 began in December 2021. The project is owned by Neoen and the construction contract was awarded to a consortium of GE Renewable Energy and Elecnor. Generation capacity of Stage 1 is anticipated to be 412MW. The Government of the Australian Capital Territory has signed a 14-year contract for 100MW of electricity from the first phase of Stage 1, and BHP signed a 70 MW baseload renewables contract for phase 2 to power its Olympic Dam mine. Neoen’s 238.5 MW / 477 MWh Blyth Battery in South Australia will balance power for the mine. Goyder South Stage 1 consists of 75 GE 5.5-158 Cypress wind turbines, with a new transmission line to connect to the Robertstown substation. First power came online in April 2024, and the facility was fully operational in late 2025. Neoen gave 1,000 hectares at World’s End Gorge to the South Australian government in 2023, paving the way for a new national park along with the Hopkins Creek Conservation Park in Ngadjuri country. The 238.5 MW / 477 MWh Blyth grid battery operates in 2025 to balance power for the mine. The Goyder South Wind Farm replaced the 119 MW Stony Gap Wind Farm which had initially been proposed for the s
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).