Boškov Most Hydro Power Plant
North Macedonia
The 2781st largest power station in the world
Boškov Most Hydro Power Plant, referred to as Boškov Most HPP, is a derivation plant planned to be built in Mala Reka valley, in the southernmost part of the Mavrovo National Park, in North Macedonia. It will have a total capacity of 71,5 MW. Construction is expected to last 4 years. The project raises several environmental concerns, including threats on the survival of the Balkan lynx.
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).