Baganuur 50 MW Battery Storage Power Station
Baganuur, Mongolia
The Baganuur 50 MW Battery Storage Power Station (Mongolian: 50 ) is a battery storage power station in Baganuur, Ulaanbaatar, Mongolia.
The contract to construct the power station was signed on 6 September 2024. Groundbreaking for the construction of the power station was held on 15 September 2024. In early December 2024, testing was done to the battery. On 6 December 2024, the power station began to supply electricity to the central system of national grid.
The power station was constructed by Envision Energy general contractor company from China. The Monhorus International company of Mongolia acted as the subcontractor.
The power station sits on a site area of 5 hectares.
The power station has an installed generation capacity of 50 MW and storage capacity of 200 MWh. It is connected to the 220/110/35 kV Baganuur Substation on its southeastern side.
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).