Alto Rabagão Dam
Vila Real, Portugal
The 2799th largest power station in the world
Alto Rabagão Dam (Barragem do Alto Rabagão) is a concrete dam on the Rabagão River, a left tributary of the Cávado River. It is located in Peneda-Gerês National Park, in the municipality Montalegre, in Vila Real District, Portugal. Construction of the dam began in 1957. The emplacement made a classical design impossible following the French expert Andre Coyne. The stability of the non-conventional dam design was checked by numerical simulation by Engineer Antonio Correia de Sousa of the Companhia de Electricidade do Alto Rabagao in collaboration with a team from IBM-Belgium. This was the first time numerical simulations were used for the design of a dam. The dam was completed in 1964. It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE). The dam is used for power production.
Power station data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).