Barun Sengupta metro station
India
Barun Sengupta (also known as Science City), is a metro station of Orange Line of the Kolkata Metro located at Parama Island in the Dhapa area of Kolkata, West Bengal, India, serving Dhapa, ITC Royal Bengal, JW Marriott and Science City areas. The station is named in honour of the founder of Bartaman, Barun Sengupta. The station is elevated above the Eastern Metropolitan Bypass.
This station is located in Dhapa across the service road and footpath on the eastern side of Biswa Bangla Sarani at Parama Island. The main elevated structure of the station is situated along the service road and footpath adjacent to the New Garia-bound lane of Biswa Bangla Sarani near Maa Flyover. It is geographically located at 22.543986°N 88.399274°E / 22.543986; 88.399274. The previous station of the station is Ritwik Ghatak metro station at a distance of 1.4 km (0.87 mi) and the next station is Beleghata metro station at a distance of 0.9 km (0.56 mi).
This project was sanctioned in the budget of 2010–11 by Mamata Banerjee with a project deadline of six years. The execution of this project has been entrusted to RVNL at a cost of Rs 3951.98 crore. It will help to reduce travel time between the southern fringes of Kolkata to Netaji Subhas Chandra Bose International Airport. In October 2011, RVNL awarded Gammon India Limited, the tender for the construction of the metro corridor from VIP Bazar Metro Station to Nikko Park (Nalban metro station), including stations, as part of Package-II of Orange Line. Amongst those metro stations, one in Dhapa was also sanctioned, i.e., Barun Sengupta. In January 2012, the construction of the metro station along with the metro line started. The construction of the station was stopped in 2015 due to land dispute at Tagore Park culvert and a pair of footover bridges. The construction of the station started again in May 2017 and was fully completed in early 2023. But the metro couldn't be started due to a viaduct gap over Tagore Park culvert. A week later after inauguration and a day after commercial run started on Kavi Subhash-Hemanta Mukhopadhyay section, in March 2024, RVNL announced the completion of that 76 m viaduct gap after construction of a si
Data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).