Narude Dam
The 602nd tallest dam in the world
The Narude Dam is a gravity dam on the Shō River about 22 km (14 mi) south of Nanto on the border of Toyama and Gifu Prefectures, Japan. It was constructed between 1950 and 1952. The dam has an associated 97 MW hydroelectric power station which was built in two parts. The first part of the power station (37 MW) was commissioned in 1951 and the second part of the power station (60 MW) was commissioned in 1975. Of the nine dams on the Shō River it is the sixth furthest downstream.