High Wycombe railway station
Australia
High Wycombe railway station is a Transperth commuter rail station in Perth, Western Australia. The station is the eastern terminus of the Airport line and was one of three stations built as part of the Forrestfield–Airport Link project. The station was originally known as Forrestfield station during planning and construction. The contract for the Forrestfield–Airport Link, which consists of 8 kilometres (5 mi) of twin bored tunnels and three new stations, was awarded to Salini Impregilo and NRW Pty Ltd in April 2016. High Wycombe station itself was constructed above ground, with the line entering a tunnel just north of the station. Construction began in November 2016, with works initially focussing on building the tunnel dive structure. Tunnelling began in July 2017, and construction of the station itself had begun by November 2017. For much of the construction period, the site contained infrastructure to support the tunnelling operation. Originally planned to open in 2020, the line officially opened on 9 October 2022. It is served by trains every twelve minutes during peak and every fifteen minutes outside peak and on weekends and public holidays. At night, trains are half-hourly or hourly. The journey to Perth station takes 22 minutes.
Data from Wikidata (CC0). Summary from Wikipedia (CC BY-SA).