Third Mainland Bridge
Nigeria · Africa
About
Third Mainland Bridge is the longest of three bridges connecting Lagos Island to the mainland, the others are the Eko and Carter bridges. It was the longest bridge in Africa until 1996 when the 6th October Bridge located in Cairo was completed. The bridge starts from Oworonshoki which is linked to the Lagos–Ibadan Expressway and Oshodi–Apapa Expressway, and ends at the Adeniji Adele Interchange on Lagos Island. There is also a link midway through the bridge that leads to Herbert Macaulay Way, Yaba. The bridge was built by Julius Berger Nigeria PLC. The phase one of the project was commissioned by President Shehu Shagari (1925–2018) in 1980 and completed by President Ibrahim Babangida in 1990; it measures about 11.8 km in length. By 2006, many commuters had reported that the Third Mainland Bridge was vibrating noticeably, indicating that it needed urgent attention. As a result, remedial work was commenced on portions of the bridge at different times, leading to intermittent partial closure of the bridge. In January 2013, this work was completed. Recently, there have been rumours of cracks on the bridge. This, however, was denied by authorities. The eight-lane bridge experienced a new look during the last repairing exercise, painting the bridge guide with the colours of Nigeria: green, white, green, and also general painting was done out for a new look. The repair works on the br
Adapted from Wikipedia (CC BY-SA). Photography via Wikimedia Commons.