Asia

What Service Stations Of Tomorrow Look Like – Expo 2020 Dubai

DUBAI, UAE, Feb. 23, 2021 /PRNewswire/ — ENOC Group, the Official Integrated Energy Partner of Expo 2020 Dubai, has unveiled its innovatively designed Service Station of the Future, located at the Expo 2020 site.


ENOC Service Station of the Future

In addition to supporting the logistical needs of Expo 2020’s fleet ahead of the global event, it will serve the public at District 2020, the smart human-centric community that will become Expo’s physical legacy after the event concludes on 31 March 2022.

The station is the world’s first LEED Platinum certified and the region’s first to incorporate on-grid wind turbine for power generation and carbon fibre in the construction of its canopy, with the design inspired by the ghaf, UAE’s national tree.

Over 43,000m2/37 tonnes of carbon fibre have been used to build the 133 multi-layer canopy frame. The leaf-shaped ethylene tetrafluoroethylene cushion canopy is 100 per cent UV ray-protected and corrosion-proof, and illuminated with more than 3,800 LED light modules.

The nine tree designs that support the station were built from another 22,500m2 of carbon fibre. Some 283 solar photovoltaic panels generate 143 MWh of solar power per year and a 25-metre wind turbine produce 12.7 MWh of wind energy annually.

Highlighting the group’s aspirations to ‘Reimagine Energy’, HE Saif Humaid Al Falasi, Group CEO, ENOC, said: “Our role as Official Integrated Energy Partner for Expo 2020 Dubai provides us the opportunity to showcase our industry and country on the global stage. The station further underlines our participation at the event. The first-of-its-kind in the world which harnesses the power of renewables, it heralds a new era in fuel retail.”

The station uses carbon filtration technologies to recycle grey water for irrigation, and has drinkable air units with ozonation techniques to convert water molecules from the air to drinkable water for staff. Machine learning, artificial intelligence and data analytics customise retail offerings, managing queue and waiting times at the forecourt, and improving the customer journey.

Vehicle mapping surface lighting direct vehicles to the fuelling area, as well as entry and exits. Over 12 million LED chips illuminate the digital screens.

For enhanced safety, the station uses advanced fuel management and gauging systems, providing 24-hour leak detection.

ENOC recorded 400,000 manhours during the build process, with zero lost to injury, demonstrating its commitment to adhering to best practices in health, safety and environment.

PR Newswire

Recent Posts

Five dead, over 200 injured in Christmas market attack in Germany’s Magdeburg

A tragic attack at a Christmas market in the eastern German city of Magdeburg left…

1 hour ago

Trump’s debt ceiling demand set aside as US Senate passes bill to avert Govt. shutdown

In a race against time, the Senate passed a crucial bipartisan funding bill early Saturday…

1 day ago

Russian President says he regrets not invading Ukraine earlier, in his year-end press conference

In his annual end-of-year press conference, Russian President Vladimir Putin reflected on Russia's ongoing war…

2 days ago

House rejects GOP proposal to avert weekend shutdown of US Federal Government

The federal government moved closer to a shutdown on Thursday after the House of Representatives…

2 days ago

Netanyahu announces Israeli troops will stay in Syria’s Demilitarized Buffer Zone

Israeli Prime Minister Benjamin Netanyahu declared on Tuesday that Israeli forces will remain in the…

4 days ago

Chief of Russia’s nuclear protection forces killed in Moscow bombing

A high-ranking Russian military officer, Lieutenant General Igor Kirillov, was killed in a targeted bombing…

5 days ago